Expeditionary Communications Kit
CNR Expeditionary Kit (E-Kit™)
A complete fly-away expeditionary communications station engineered for the RT-1523E/F SINCGARS ASIP, the L3Harris RT-1702, and the Thales AN/PRC-7350 (RT-2129) Combat Net Radio. The PTS CNR E-Kit™ delivers everything needed for rapid PACE-compliant HF/VHF communications — CNR PSDS, Rolatube mast, RAVEN HF antenna, interconnect cabling, and transit case — in a single air-transportable package. Comms up in under 20 minutes.
< 20 min
Full setup including antenna
AC + DC
Dual power input capability
Export-controlled — ECCN on request
Export classification
Made in USA
North Alabama manufacturing
What's Included
CNR Power Supply Docking Station
Patented AC/DC PSDS engineered for the RT-1523E/F SINCGARS ASIP and L3Harris RT-1702, and the Thales AN/PRC-7350 (RT-2129). Operates on AC power (85–260 VAC / 47–63 Hz) or DC vehicle power (20–33 VDC, Mil-STD-1275E). No batteries required.
Contact PTS for part number
RAVEN HF Antenna (150W)
Rapid Deployment Folded Dipole HF Antenna rated at 150W. Deploys in minutes without tools. PTS-designed and manufactured.
ANT-PTS-000150-2-1
Rolatube Mast (5m)
Rolatube rollable composite mast. Stores as a compact roll, deploys to full height in under 2 minutes. No tools required. PTS is the exclusive North American DoD distributor.
Contact PTS for part number
Interconnect Cabling
Radio-specific cabling for the RT-1523E/F ASIP / RT-1702. All cables included — no field fabrication required.
Contact PTS for part number
Transit Case
Pelican-style transit case. Everything ships and stores in one ruggedized case. MIL-SPEC latches and foam insert.
Included with kit
CONUS Power Cable
Standard AC power cable for CONUS operations included. International power adapter available on request.
Included with kit
Part Numbers
| Configuration | Part Number |
|---|---|
| CNR E-Kit™ Basic | Contact PTS for part number |
| CNR E-Kit™ Deluxe | Contact PTS for part number |
| CNR PSDS only | See /products/psds-cnr |
Part numbers pending confirmation. Contact PTS at 256-539-6787 or info@pts-inc.com for current pricing and availability.
Calculate Your Field Deployment Savings
Run fully off-grid. Solar charges by day, hot-swap battery bank powers by night.
Your Field Deployment Configuration
E-Kit™ Model
E-Kit™ (CNR)
The battery box powers all radios simultaneously
NTC = 21 days · deployment = 90–270 days
CONUS: 5–8 hrs. Desert: 10–12. Northern Europe: 3–5.
BB-2590/U: $218.23 · 2 batteries/radio/day (baseline) · System draw: 25W · E-Kit™ GSA: $40642
Your Field Deployment Savings
Batteries Without E-Kit™ (90 days)
360 batteries
$78,563 total battery spend
Batteries With E-Kit™ (rotation inventory)
4 batteries
$873 — recharge daily via solar
Batteries Eliminated
356
$77,690 in battery cost savings over 90 days
E-Kit™ Investment
$40,642
1 E-Kit™ station at GSA pricing · includes 2x 120W solar
Net Savings After Investment
$37,048
Battery savings minus E-Kit™ investment
Payback Period
47 days
E-Kit™ investment recovered in battery savings
Ready to deploy the E-Kit™?
Model: E-Kit™ (CNR) · Includes 2x 120W solar panels · Hot-swap battery box · GSA 47QSWA22D008V · GPC accepted
Estimates based on BB-2590/U (NSN 6140-01-490-4316) at $218.23/unit with a station draw of 25W and 8 average sun hours per day. Solar panels (2x 120W included with E-Kit™) assumed to fully sustain station load during daylight hours. Hot-swap operation requires minimum 2 batteries installed at all times. Rotation inventory ensures continuous night operation with practical hot-swap buffer. E-Kit™ price shown at the current GSA schedule price (47QSWA22D008V catalog). Individual E-Kit™ model pricing varies — contact PTS for model-specific GSA pricing. PTS Expeditionary Communications makes no warranty as to the accuracy of these estimates for any specific program.
Ordering
The PTS CNR E-Kit™ is available via GSA Schedule 47QSWA22D008V (NAICS 334220), CHS-6 contract W15P7T-23-D-0003 (Prime: Leidos), the DLA SOE/TLSP program (MIPR/MILSTRIP), open market, and Government Purchase Card (GPC accepted). Sole source justification documentation available on request.